Follow along as we design and build our custom dream home.

Friday, April 20, 2018

The Backyard, Area D

Area D. 



This spot wasn't too bad.  There was another load of lave rock, about 50 more large flat rocks, and a bunch of weeds that needed to be pulled; but for the most part, it just needed some love.  And then there was that random electrical safety situation to deal with. 
SHARE:

Wednesday, April 18, 2018

The Backyard, Area C

As I mentioned in the previous post, Area C was my nemesis.  This area is right outside the Converted Porch, so we assume the previous owners wanted to create a landscaped focal point in their backyard.  We could tell that they put a lot of work into this feature and it was not easy to disassemble; but it definitely needed to be.  This area featured a fake pond, surrounded by large flat stones, lava rocks, two fountains or bird baths (they were so damaged that we couldn't be sure) and some sort of large bush that was becoming a tree. They also had electricity running to the pond area that powered some in-ground lights and possibly one of the fountains.  At one point I'm sure it was nice, but at this point in time it had become unsafe. 
SHARE:

Tuesday, April 17, 2018

The Backyard, Area B

I'm going to go a bit out of order from the picture showing the areas of work in the previous post. After clearing out big trash items such as loose fence posts, pipes, piles of old wood, garden stakes, random flower pots, and broken lawn chairs, we were able to start focusing on specific areas. We started out with Area B due to the fact that it was covered in Poison Ivy. 
SHARE:
Blogger Template Created by pipdig